Abstract

In the Chemical Volume Control System (CVCS) reactor primary coolant leakage incident, which occurred in Tsuruga-2 (4-loop PWR, 3,423 MWt, 1,160 MWe) on July 12, 1999, it took about 14 hours before the leakage isolation. The delayed leakage isolation and a large amount of leakage have become a social concern. Effective procedure modification was studied. Three betterments were proposed based on a qualitative analysis to reduce the pressure and temperature of the primary loop as fast as possible by the current plant facilities while maintaining enough subcooling of the primary loop. I analyzed the incident with RETRAN code in order to quantitatively evaluate the leakage reduction when these betterments are adopted. This paper is very new because it created a typical analysis method for PWR plant behavior during plant shutdown procedure which conventional RETRAN transient analyses rarely dealt with. Also the event time is very long. To carry out this analysis successfully, I devised new models such as an Residual Heat Removal System (RHR) model etc. and simplified parts of the conventional model. Based on the analysis results, I confirmed that leakage can be reduced by about 30% by adopting these betterments. Then the Japan Atomic Power Company (JAPC) modified the operational procedure for reactor primary coolant leakage events adopting these betterments.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call