Abstract
a b s t r a c t Southeastern Anatolia Project (GAP) region in Turkey is rich in water for irrigation and hydroelectric power. The Euphrates and Tigris Rivers represent over 28% of the nation's water supply by rivers, and the economically irrigable areas in the region make up 20% of those for the entry country. Turkey has a total gross hydropower potential of 433 GWh/yr, but only 125 GWh/yr of the total hydroelectric potential of Turkey can be economically used. By the construction of new hydropower plants, 36% of the economically usable potential of the country would be tapped. The GAP region has a 22% share of the country's total hydroelectric potential, with plans for 22 dams and 19 hydroelectric power plants. Once completed, 27 billion kWh of electricity will be generated annually.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.