Abstract
The gymnasium of Fule International School in Mianyang, Sichuan are multi-storey large-span buildings with a maximum span of 36 m and use a new system-steel grid cassettle structure. In this paper, the structure form, prefabricated construction method and support unloading process of the gymnasium are introduced in detail. To ensure smooth construction unloading, the deflection deformation of the large span floor and the field splicing node are monitored. Results show that the prefabricated construction method of the Mianyang Fule International School Gymnasium and the steel column-scaffold combination support system are affordable. After unloading, the floor has the traits of plates and relatively greater rigid reserve. Thus, it is applicable for large-span and high-load floor structure. The stress in the splicing node in the inflection point (L/2, L is the size of the grid) is relatively small, the bolt and the shearing-resistance plate have no slump, and the field splicing node is safe and reliable. The findings provide a certain reference value for the research and innovation in the process of assembly construction of multi-storey and large-span building.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Electrical Engineering & Education
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.