Abstract

The article is devoted to the issue of optimizing the development system and increasing the efficiency of carbonate deposits of the Tournaisian stage of the Chetyrmanskoye field developing, and the formation of a strategy for their additional development. As a result of the horizontal drilling, the rate of withdrawal from current recoverable reserves in the main area in terms of reserves increased from 0.3 to 5%, which confirms the high efficiency of horizontal wells drilling with multi-stage hydraulic fracturing in reservoirs with high stratification and heterogeneity degree of the productive section in order to increase the rate of reserves production and achieve the approved oil recovery factor, as well as the high efficiency of the proposed methodological approach in the design of the facility development by a system of horizontal wells, the correct choice of the facility development strategy in the design solutions formation. Keywords: oil fields development; carbonate deposits; development of reserves; multi-stage hydraulic fracturing; horizontal well.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call