Abstract

The Japan Atomic Energy Research Institute has conducted a piping reliability test program to demonstrate the safety and reliability of light water reactor primary piping. In this program, pipe fatigue test, leak-before-break (LBB) verification test and pipe rupture test were carried out to examine the integrity of piping, to verify the LBB and to demonstrate the effectiveness of protective measures against jet impingement and pipe whip loads under a pipe rupture event. In the pipe fatigue test, a procedure to predict the fatigue crack growth was developed, and the integrity of piping during the plant service life was evaluated. In the LBB verification test, the pipe fracture test and the leak rate test were performed to verify the LBB in the primary piping. In the pipe rupture test, the influence of jet impingement on the target disk and the deformation behavior of whipping pipe and restraint were investigated. Using the test results, the jet impingement behavior and the effectiveness of pipe whip restraint were demonstrated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.