Abstract

In this paper we introduce a newly developed measuring system for partial discharges (PD) in after-laying tests on site for a long-distance gas insulated transmission line (GIL) in a tunnel. We evaluate the length of harmful particles for the overvoltages to be considered for the Shinmeika-Tokai GIL. The length ofparticles detectable by the PD sensors is compared with the length of harmful particles. The highly sensitive PD measuring system took advantage of low noise levels in the tunnel. We applied the system to the after-laying test on site and confirmed that the developed system was effective to verify the required performance of a long distance GIL in a tunnel.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.