Abstract

Abstract: In the “WA Advantage” statement of February 1992, the Western Australian premier announced restructuring proposals for the State Energy Commission of Western Australia (SECWA). The Dampier‐Perth natural gas pipeline will be taken out of SECWA and operated by an independent authority on an open access basis. SECWA will also withdraw from the Pilbara region to be replaced by a Pilbara Electricity and Gas Authority. To be considered by the Carnegie Commission are proposals for the separation of electricity and gas operations and, within electricity operations, separation into generation, transmission, distribution and supply functions. The rationale for these policy changes is an attempt to introduce competition into these sectors of the energy market to improve efficiency and reduce the disparities in energy costs between Western Australia and the other Australian states. If carried out to their full extent, the proposals for SECWA will amount to the most comprehensive restructuring of a publicly owned energy utility in Australia.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.