Abstract

New techniques for restoration of a failed large power system are presented using decision and control approach (Zaborszky, 1980 b). The proposed method takes advantage of fast digital computing, reliable communications, data base structure, modern system theory to set up an expert computer-operator partnership. The computer establishes target systems for future time points for the most effective use of all equipment expected to be available. Effective computer operations are readily established for this task. Once the operator is presented with target systems which he knows to be viable he can very effectively pick action sequences to reach the target. In turn the computer again can check for consistency and arrange the precise time sequence of individual restoration steps. The result is the on line res t oration plan. During its entire preparation and execution the operator is monitoring the plan and the computer is monitoring its execution to guard against improper sequencing or time delays. Generation of the targets is the key feature of this approach. It is a large scale problem which must be done with high computational efficiency and with sufficient accuracy to make the proposed approach successful. Accordingly, the major part of the paper is devoted to the target generation problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.