Abstract

The effects of pipeline construction and reclamation techniques on the restoration of rough fescue plant communities following pipeline construction in southwestern Alberta, Canada were evaluated after 7–40 years. The pipeline construction right-of-way (ROW) sites varied from no recovery of rough fescue grassland to moderate recovery. The ROW sites had a higher proportion of introduced grasses and forbs, less topsoil, and poorer rangeland health than the adjacent undisturbed grassland. Within the ROW sites, less topsoil was present on those with larger diameter pipe and which had topsoil fully stripped from the ROW during construction. Introduced grasses, Festuca ovina (sheep fescue) and Poa compressa (Canada bluegrass), succeeded in establishment following seeding and persisted for at least 40 years. Poa pratensis (Kentucky bluegrass) dominated many of the ROW sites. Contributing factors to moderate recovery of rough fescue grassland were related to post-growing season pipeline construction, ideally, between August and March, summer or fall seeding, and minimum disturbance trench-only stripping. Reclamation practices appeared more important than time since restoration in the restoration of rough fescue grassland.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.