Abstract

Typhoon Haiyan damaged or destroyed health infrastructure, equipment and services essential to the Philippine National Tuberculosis Programme (NTP), and it had to be re-established in the affected areas in Regions 6, 7 and 8. Continuing treatment and restoring diagnostic capacity were also challenging. The Philippines has one of the highest tuberculosis (TB) burdens in the world. At the time of Typhoon Haiyan, there were an estimated 26 ,00 TB cases on treatment at directly observed treatment, short-course (DOTS) centres and 356 multidrug-resistant TB cases registered at programmatic management of drug-resistant TB (PMDT) sites. As TB was not included in the Philippines early-warning post-disaster surveillance system, tracking TB patients was difficult after Haiyan. Immediately following Haiyan, each aspect of the NTP was assessed to determine the extent of damage. TB patients were traced and services restored. We created maps showing the location of temporary TB diagnostic and treatment services, which hastened referrals. We provided new laboratory equipment, training and rapid testing capabilities in the affected regions. All TB services in the affected areas (473 DOTS, 490 TB microscopy and six PMDT facilities) were restored just two months after Haiyan. Key lessons learnt from the NTP experience following Tyhoon Haiyan were: (1) the importance of having an electronic TB registry (database); (2) the need to include TB in the post-disaster surveillance system; (3) clear guidelines for TB control in disasters; and (4) the importance of coordination with all partners.

Highlights

  • Actions and outcomes: Immediately following Haiyan, each aspect of the National TB Control Programme (NTP) was assessed to determine the extent of damage

  • In the areas where facilities, records and equipment were damaged by Typhoon Haiyan, the Philippine National TB Control Programme (NTP) had to be re-established quickly

  • We report on the actions taken and lessons learnt from the re-establishment of the NTP in these affected areas

Read more

Summary

Introduction

Actions and outcomes: Immediately following Haiyan, each aspect of the NTP was assessed to determine the extent of damage. All TB services in the affected areas (473 DOTS, 490 TB microscopy and six PMDT facilities) were restored just two months after Haiyan. In the areas where facilities, records and equipment were damaged by Typhoon Haiyan, the Philippine National TB Control Programme (NTP) had to be re-established quickly.

Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.