Abstract

Product alternatives suggested by a generative design system often need to be evaluated on qualitative criteria. This evaluation necessitates that several feasible solutions which fulfill all technical constraints can be proposed to the user of the system. Also, as concept development is an iterative process, it is important that these solutions are generated quickly; i.e., the system must have a low convergence time. A problem, however, is that stochastic constraint-handling techniques can have highly unpredictable convergence times, spanning several orders of magnitude, and might sometimes not converge at all. A possible solution to avoid the lengthy runs is to restart the search after a certain time, with the hope that a new starting point will lead to a lower overall convergence time, but selecting an optimal restart-time is not trivial. In this paper, two strategies are investigated for such selection, and their performance is evaluated on two constraint-handling techniques for a product design problem. The results show that both restart strategies can greatly reduce the overall convergence time. Moreover, it is shown that one of the restart strategies can be applied to a wide range of constraint-handling techniques and problems, without requiring any fine-tuning of problem-specific parameters.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.