Abstract

Penetration levels of distributed wind power park modules (WPPMs) reach such high levels in parts of the world, for example, Germany, that reverse power flows (RPFs) from distribution to transmission level occur regularly in certain areas of the power system. This study compares the impact of normal and RPFs on the network fault response of WPPMs in distribution systems that are prone to fault-induced delayed voltage recovery issues for a fault in the transmission system. The study contributes to the ongoing discussion on grid connection requirements for WPPMs and raises awareness of a prolonged low-voltage ride-through (LVRT) operation of WPPMs when these are set to ride-through faults in ‘blocking mode’, during which the set-points for the active and reactive currents are set to zero. For RPFs such LVRT operation causes a substantial sustained active power deficit in power system areas with high penetration of distributed WPPMs and potentially leads to a stability risk.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.