Abstract

The aim of this study is to evaluate the buffering capacity of constructed wetlands by analyzing the response to sudden organic load changes. Nine horizontal flow experimental beds were divided into three equal groups and monitored in a three-phase experiment. Influent COD mass loads during Phase I were 11.4, 5.3 and 0g/m2/day for Groups A–C, respectively. During Phase II there was a rise in COD mass load and Phase III restored initial conditions. Group A showed a reduction in COD removal efficiencies with mass load increase despite more intense microbiological activity. In Group B planted beds there was a reduction of the mass load removal, which could have been due to a biofilm disturbance caused by an invasive millipede species. When mass load was lowered, removal efficiencies improved. Group C showed residual effluent COD during Phase I but provided adequate removal efficiencies (75–84%) when supplied with 1.7g/m2/day during Phase II. The results of this study suggest that the buffering capacity of constructed wetlands may not be enough to maintain COD removal efficiencies during a sudden organic load increase.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.