Abstract

AbstractA membrane bioreactor (MBR) pilot plant was operated in two subsequent experimental periods (namely, Periods I and II) with different start-up and sludge withdrawal strategies to study its peculiar biokinetic behavior by using respirometric techniques. Two extreme operational conditions were chosen to investigate the different biomass activity under dynamic or pseudostationary conditions during and after the start-up phases. Particularly, the MBR pilot plant was operated with the same volumetric loading rate (VLR) and permeate flux but differently managed during the start-up phase. In Period I, the MBR pilot plant was started up without sludge inoculum and operated without sludge withdrawals; on the contrary, in Period II the MBR pilot plant was started up with sludge inoculum and operated with regular sludge withdrawals. The obtained results highlighted that the different start-up strategies significantly affected the value of the yield coefficient, the storage phenomena, the decay coefficient, a...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.