India has 298.914billion tonnes of coal resources and 43.215billion tonnes of lignite resources. Underground Coal Gasification (UCG) can be used to extract the deep and un-minable coal and lignite resources in India. Total 120.666billion tonnes coal resources and 20.98billion tonnes lignite resources are confined to the depth greater than 300m which would be the potential resources for UCG. A simple approach has been developed for economic evaluation of UCG project. The UCG module can be considered to consist of two vertical wells. An equilibrium model based on elemental composition of coal is used to predict the gas quality and yield. Based on a single UCG module dimensions, syngas production and power generation per module are calculated. The capital and operating costs are estimated for 100MW UCG power plant with the multiple UCG modules. Three Indian coal samples- one sub-bituminous coal (C) and two lignites (A and B) are used to estimate the capital and operating costs of 100MW UCG power plant. The capital costs are in the range of $210–246millions. The estimated costs of clean syngas production per GJ are $1.34, $0.90 and $1.73 for sample A, B and C respectively. The estimated electricity generation costs per MWh using UCG syngas are $24.27, $19.10 and $28.11 for sample A, B and C respectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.