Abstract

The electricity generation in Switzerland is mainly based on hydropower (55% of total production). The exploitation of water in the hydropower sector can generate significant so-called resource rents. These are defined by the surplus return above the value of capital, labor, materials, and energy used to exploit hydropower. In Switzerland, hydropower producers pay to the State a fixed fee per kW gross capacity. With this system the substantial differences in costs, revenues and in the production characteristics of the hydropower plants are not taken into account. In this context, the following paper has two main goals: (1) to discuss the introduction in the Swiss hydropower sector of a new payment system based on a resource rent tax; (2) To propose a combination of a RRT system with a benchmarking analysis of the production cost obtained through the estimation of a stochastic frontier variable cost function. We estimate a true random effects stochastic frontier variable cost function using panel data in order to overcome the asymmetric information problem. In addition, using the information on cost efficiency of the single companies, we show how to introduce in the RRT scheme a benchmark system which gives incentives to minimize the production costs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.