Abstract

In the context of business process management, the resources required by business processes, such as workshop staff, manufacturing machines, etc., tend to follow certain availability patterns, due to maintenance cycles, work shifts and other factors. Such availability patterns heavily influence the efficiency and effectiveness of enterprise resource management. Most existing process scheduling and resource management approaches tend to tune the process structure to seek better resource utilisation, yet neglect the constraints on resource availability. In this article, we investigate the scheduling of business process instances in accordance with resource availability patterns, to find out how enterprise resources can be rationally and sufficiently used. Three heuristic-based planning strategies are proposed to maximise the process instance throughput together with another strategy based on a genetic algorithm. The performance of these strategies has been evaluated by conducting experiments of different settings and analysing the strategy characteristics.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.