Abstract

AbstractThis study investigated resource leveling problems concerning linear construction projects based on the line of balance (LOB) technique and constraint programming. In addition, an LOB‐based scheduling optimization model for resource leveling is proposed. This model retains the advantages of the conventional models, including multiple‐resource management and natural rhythm concept, and showcases new abilities: scheduling optimization without specifying a fixed schedule; scheduling optimization on more comprehensive optimization objects and variable values; maintaining continuity of resource while completely eliminating the occurrence of idle time; handling more comprehensive constraints after the addition of logical constraints and explicit expression of certain new constraints. The flexibility, practicality, and solution quality of the proposed model were enhanced accordingly. Further, a scheduling system was developed to assist in schedule optimization and visualization. Lastly, effectiveness of the proposed model was verified based on four case studies involving three case projects investigated in extant LOB‐based studies.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.