Abstract
Resource Constraint Project Scheduling Problem (RCPSP) is one of the most important problems in project scheduling and operation research and has attracted an ever growing attention. In the real world, most of the strategic goals of organizations are reached with different programs which are consisting a set of interrelated projects. Regarding to what has been said, in this paper, a model for programs scheduling with considering the constraint of resources is provided. In this model, two objective functions including Net Present Value (NPV) and quality of the program have been considered. The purpose of this model is to maximize net present value of program's benefits and minimize the time and cost non-conformities which are related to activities' quality deficiencies. Finally a numerical example has been provided and solved by GAMS 23.5 version in order to show how the proposed mathematical model is working.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.