Abstract
Despite the dynamic nature of real life scheduling problems, few studies focus on stochastic resource constrained project scheduling problem and its variants. In this study, we consider stochastic resource possibilities and propose a new chance constraint, piecewise-linear and mixed integer programming model. Model is tested and verified with known project instances. One of the main strengths of the proposed model is it can be used to construct baseline schedules with a predetermined confidence interval. This gives scheduler an opportunity to construct proactive actions in order to minimize disruptions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.