Abstract

In resource-constrained project scheduling problems, resources are typically classified as being either renewable, non-renewable, or doubly-constrained. A new resource classification, recyclable, is introduced. Notation and a generalized problem formulation are developed for resource-constrained job scheduling problems where resources are recyclable. This foundation is then used for studying the single-machine scheduling problem with tooling constraints. For a given set of jobs, the problem is to find the job sequence, tool type quantities, and tool recycling schedule such that the sum of job completion times and quantity of tools allocated are both minimized. Two solution approaches are developed, and examples are used to compare and contrast the approaches. The results indicate that the ‘traditional’ job scheduling approach (i.e. schedule jobs first, then tools) can lead to sub-optimal solutions. Furthermore, by scheduling jobs and tools simultaneously, it may be possible to attain a given level of performance with fewer tools.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.