Abstract

We consider a NP-hard resource allocation problem of allocating a set of resources to meet demands over a time period at the minimum cost. Each resource has a start time, finish time, availability and cost. The objective of the problem is to assign resources to meet the demands so that the overall cost is minimum. It is necessary that only one resource contributes to the demand of a slot. This constraint will be referred to as single resource assignment (SRA) constraint. We would refer to the problem as the S_RA problem. So far, only 16-approximation to this problem is known. In this paper, we propose an algorithm with approximation ratio of 12.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.