Abstract

A robust project scheduling based on resource flow network can prevent new resource contentions from adjustments when encountering the uncertainties during the execution. However, the resource flow network will increase the interdependencies of the activities and lower the robustness of the schedule. For this reason, we propose a heuristic resource allocation algorithm of maximizing the use of precedence relation (MaxPR) to optimize the resource allocation schedule. Our contributions are as follows: first, this paper presents a two-stage algorithm to allocate resources. In Stage 1, the activity pairs with precedence relation can be divided into two categories, zero-lag relation and relation with time-lag. Second, the strategy of unavoidable arcs is adopted to allocate resources to the activity pairs without precedence relation in Stage 2. Third, it is also proved by simulation experiments that MaxPR and its multiple allocation strategies will generate less additional constraints compared with other six algorithms. It can also adapt to various network structures, showing the concision and feasibility of this algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.