Abstract
Need for elevated railways may arise when capacity of bus transit and light rail transit that share the right of way with roadways becomes insufficient and the cost of railways with dedicated right of ways such as underground railways becomes costly. A similar need arose in the city of Makah and in 2010 an 18-km long; elevated railway transit service began servicing between the districts of Mina, Arafat and Muzdalifah. Today the two-track elevated system serves along the route constructed by posttensioned 25-m long U-sections spanning between piers. This paper presents the analytical studies and the finite element model of an alternative 30-m long pretensioned boxed-section evaluated during the tender stage. Following a comparison with the applied choice, benefits of the U-section with respect to the analyzed alternative will be discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.