Abstract
During the past 30 years, China has implemented structural and operational procedures to maximize sediment discharge from the impounded reaches of rivers, thereby reducing, arresting, or reversing reservoir sedimentation at many sites. Hydraulic methods used in China to preserve reservoir capacity are outlined in this paper, including sediment routing during floods, sediment flushing during floods, emptying and flushing, and density current venting. A method to compute retrogressive erosion during the drawdown of a reservoir is developed, and an approximate method for estimating the amount of sediment that can be vented from a reservoir as a density current is proposed. The computed values are compared with field data. Field data on the floodplain slope formed during flood season and the bottom slope of the main channel formed during nonflood season are analyzed. Empirical formulas for both slopes are presented for estimating long-term storage capacity.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.