Abstract
On the foundation of the item that the residence flood controlled technique and standard tested and the analysis according to the formation of the sediment and the regulation of the sedimentation in the actual river. In the process of the studied item, design a kind of a new sedimentation basin in order to lower the sand carrying capacity of the down water in the limited distance and the biggest limit. Through the model experiment of this kind of the sedimentation basin and find out the result of the sink the sand under the different discharge, in order to guide the actual engineering application.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.