Abstract

The security researches of energy dissipation were always the focus in the High arch dams. Statistically, the trajectory type energy dissipation is the most widely used in the built high arch dams, and the protected plunge poor were always set downstream the dam body. However, the widely used protected plunge poor need large investment with the disadvantage of complicated operation and maintenance. Along with the construction of concrete high arch dam in the Southwest China, the “Reventment-Protected and Non-Bottom-Protected Plunge Pool” has been studied and proposed, which has the advantage of more simplified project design and more economy investment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.