Abstract

Under the “Double Carbon” strategy, the speed of new energy installation and grid connection has been continuously improved. In order to better absorb new energy power generation and ensure the safe and stable operation of the power system, it is urgent to provide ancillary service resources such as frequency regulation and peak shaving. The virtual power plant aggregates the distributed energy scattered in the power grid through advanced communication, computing, dispatching, market and other means, making it a “power generation system” that can be uniformly dispatched, and then follow the dispatching instructions and participate in the ancillary service market. Firstly, the relevant structure and development of virtual power plant is introduced. Secondly, the relevant types of virtual power plants participating in the ancillary service market are analyzed. Thirdly, the actual situation of virtual power plants participating in ancillary service markets for frequency regulation and peak shaving is compared and analyzed with reference to the market access conditions, compensation mechanism and allocation mechanism, which lays a theoretical foundation for different provinces to further improve the mechanism of virtual power plants participating in ancillary service markets. At last, according to China’s national conditions, suggestions on the construction of market mechanism for virtual power plants to participate in ancillary services are proposed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.