Abstract
Distributed power system, especially the distributed power and micro-grid system in the mountain villages, islands and remote areas, has many advantages, which can be used as an effective supplement of grid to help solve the problem of electricity supply. The connected-grid inverter needs to be able to work in both grid mode and island operation mode in order to ensure the safety of the local critical load. The paper proposed the seamless switching control strategy for two modes of switching. The experimental results verify the property of the topology structure and control strategy.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.