Abstract

At present, there are numerous treatment schemes for slope, while there is a lack of research on scheme evaluation and optimization. According to analytic hierarchy process, this paper takes two treatment schemes for Cangshang pit slope as research object, which are reducing load by cutting slope and strengthening by grouting, handles the complicated problem hierarchically and systematically, and establishes hierarchical structure model. Judgment matrixes are constructed to analyze multiple factors synthetically, which combine qualitative analysis and quantitative analysis preferably, and optimal scheme is selected finally.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.