Abstract

In the context of south china electricity market, the concept of contract transfer and replacement deal is set forth in advance which is specialized in electricity treatment. Then, the feasibility of conducting an inter-provincial contract transfer and replacement is analyzed according to the aspects of physical characteristics, economics and policies within the china southern power grid. In addition, the advantage and disadvantage are also presented in terms of bilateral negotiation and centralized biding transaction modes. After that, the pricing mechanism and transaction mode are deliberately designed pertaining to three different situations including a party power shortage and a party "abandon water", a party power supply shortage and a party power surplus and a party power surplus and a party "abandon water". Finally, the realistic feasibility of the proposed schemes is verified through an employed numerical example.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.