Abstract

On the basis of comprehensive analysis on connotation, assessment methods and index system of river health, combined with the national river health assessment pilot project, river health assessment system is improved by increasing indicators and correcting their weights. The weights of ecological health and functional health of each zone in the national ecological function zoning are revised. According to each river's characteristics and ecological function type in water eco- logical zone, the weights of four indicators (hydrology, physical form, water quality and aquatic life) of ecological health are determined by the procedure of expert proposal - initial determination - feedback - inspection - revision. Taking the mainstream of the Yellow River from Huayuankou Station to Gaocun Station as an example, its health condition is as- sessed by determining weights of ecological health (including the weights of its four indicators in criteria layer) and func- tional health according to the ecological-functional partition and water ecological zoning it belongs to. The result is at the lower limit of good level.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.