Abstract

Constructing an effective production control policy is the most important issue in wafer fabrication factories. Most of researches focus on the input regulations of wafer fabrication. Although many of these policies have been proven to be effective for wafer fabrication manufacturing, in practical, there is a need to help operators decide which lots should be pulled in the right time and to develop a systematic way to alleviate the long queues at the bottleneck workstation. The purpose of this study is to construct a photolithography workstation dispatching rule (PADR). This dispatching rule considers several characteristics of wafer fabrication and influential factors. Then utilize the weights and threshold values to design a hierarchical priority rule. A simulation model is also constructed to demonstrate the effect of the PADR dispatching rule. The PADR performs better in throughput, yield rate, and mean cycle time than FIFO (First‐In‐First‐Out) and SPT (Shortest Process Time).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.