Abstract

Based on the structural and geological characteristics of the F1 weathering trough of a submarine tunnel and its spatial relationship with the cavern, a simplified calculation model of the weathering trough water inrush was established, and the formation, development process and influencing factors of the water inrush channel in the water-resistant rock layer were carried out by a numerical simulation of particle flow. It shows that the integrity and stability of the critical water-resistant rock mass is the key to preventing water inrush, and the identification and positioning of the water inrush channel is the basis for the grouting reinforcement design of the weathering groove of the submarine tunnel. Based on above research results, the F1 weathering trough was blocked and reinforced by the composite grouting method, and the engineering reinforcement effect was good.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.