Abstract

Aiming at the problems of diversified demand for electricity, high rate of load growth, limited distribution network corridor and single power supply mode in industrial parks, this paper explores a new scheduling strategy, studies a mechanism of source-load interactive scheduling for modern industrial parks, and puts forward three scheduling strategies, namely, optimal electricity price, friendly power grid and enhanced production. The strategy has been applied in a smart industrial park of Hunan Power Grid. The application results show that the method can effectively improve the power supply capacity of the modern industrial parks, reduce the total cost of electricity, and enhance the load rate of distribution transformers, and it also has high economic and practical value.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call