Abstract

With the increase distance of offshore wind farm, the investment proportion of high-voltage delivery submarine cable in the whole project is gradually increasing, so the reasonable selection of cable delivery scheme becomes more and more important. In this paper, for different scales of offshore wind farms, the preliminary selection basis of two delivery schemes of AC high-voltage and flexible DC is proposed, and the economic and technical comparison principles of different AC delivery schemes are further analyzed with engineering example. In general, for medium-sized offshore wind farms, if the AC high-voltage transmission scheme is used, a reactive power compensation station can be set in the middle of the cable to improve the current distribution on the cable.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.