Abstract

Based on describing the status of the organization structure of the related projects at home and abroad, the construction scheme and the project management features of the Hong Kong-Zhuhai-Macao Bridge (HZMB) are discussed, and the main operation and maintenance business after the opening of the HZMB is analyzed. Learning from the advanced organization design model-the Viable System Model (VSM), the organization operation mode of the HZMB is built, and at last a suggested solution to the organizational structure of the HZMB is proposed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.