Abstract

The China Southern Power Grid (CSG) has installed 6 sets of DC-deicer on its backbone transmission grid since the ice disaster in 2008, among which the DC-deicer in Gaopo substation of Gao-Zhao ±500kV DC transmission lines is the first OPGW deicer in CSG. Most of the existing DC-deicing research work concerns on the analyzing of transmission lines without considering the installation of de-icing switches. However, the icing problem of overhead ground lines has become the secondary influencing factor in the causation of power system fault during winter. Given this background, the general situation of the 6 sets of DC de-icer is presented and the de-icing operating process and its efficiency after the installation of de-icing switches are studied. Finally, suggestions are given on basis of the research.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.