Abstract

Renewable energy generation technologies have lower externality costs but higher private costs than fossil fuel-based generation. As a result, the choice of renewable in the future generation mix could be affected by the industrys future market-oriented structure because market objectives based on private value judgments may conflict with social policy objectives toward better environmental quality. A multi-period linear programming-based model (Resource Planning Model) is used to characterize todays electricity supply market in China. This paper incorporated the externality costs and outage costs with the long-term resource planning model in an open market. Also, the model has the objectives of maximizing the total social value. Meanwhile, the discount rate is used in the model to capture the dynamic change of different costs. A set of integrated models have been developed with some limitation, such as generation limitation, capacity limitation, annual electricity limitation, demand and demand state limitation. At last, applying the model for the resource planning of Yunnan Province in planning period shows that the decrease of the share of fossil fuel generation and the increase of the renewable energy generation which evaluates the reliability and validity of the model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.