Abstract
A new method for transient overvoltage (TOV) measurements in 500kV power system using capacitor voltage transformers (CVTs) is introduced in this paper. It is realized with a voltage sensor installed within the CVT as the low-voltage capacitor C 3 connection in series with the high-voltage (HV) capacitor C 1 and the median-voltage capacitor C 2 . Simulations studies and laboratory tests in manufactory have confirmed the validity and practicability of this method, which can be used to measure the TOV of the 500kV power grid.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.