Abstract

The steel-making industry is one of the largest power consumers in China. To decrease the power purchase as well as increase the reliability of power supply, plenty of on-site power plants (OSPP) are built in steel enterprises. Byproduct gases generated from the steel production process are the main fuels for the OSPPs. Recently, with the implementation of time-of-use (TOU) power price in China, increasing attention has been paid to the collaborative scheduling between OSPPs and gasholders. The overall electricity cost can be reduced through distributing more byproduct gases to the OSPPs during the peak-price period while distributing less byproduct gases to the OSPPs during the valley-price period. In this paper, a mixed integer linear programming (MILP) based scheduling model is built to optimise the byproduct gases distribution under TOU power price. The goal is to evaluate the load shifting potential of OSPPs in steel plants, which is seldom discussed in previous studies. Case study is implemented on two steel enterprises with different configuration of OSPPs and the optimal operation strategy is also discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.