Abstract

The displacement and stress of adjacent existing tunnel at different times after the new tunnel built are calculated by FEA models with ANSYS. The effects of each counting parameter of tunnel lining to results are analyzed, and some conclusions are educed, which can give references to the design and construction of siminiar engineerings.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.