Abstract

In order to study the influence of the navigation improvement project in the Qingyi River, on flood control of the complex river network, the water level variation of the key control stations in Shuiyang, Qingyi and Zhanghe river basins, flood diversion variation of middle reach of Shuiyang stem and flow pattern in the flow field before and after construction of the project using Mike11 model, under the conditions of designed flood and excessive standard flood. The results show that after construction of the project,the water levels at the control stations are decreasing or constant and the flood diversion of middle reach of Shuiyang stem decreases. So the project is beneficial to the flood control of the basins.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.