Abstract

The first working face production has suspend because of the great roof water inrush in Mindongyi coal mine, which has weak roof strata and mining use the fully mechanized caving method. In order to detect the height of water-flowing fractured zone, loses of drilling fluid observation method has carried on the flied test, the results showed that while the full-mechanized caving mining thickness is 7.7 m, the height of water-flowing fractured zone is 79.78 m, and the ratio of height to thickness is 10.36, meanwhile, the numerical simulation and similar material simulation have proved the test results are correct. The study enriched the domestic research fruits of the height of water flowing fractured zone, and provided technical references for Mindongyi coal mine mining.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call