Abstract

Life Cycle Cost optimization has become a new focus of urban infrastructure engineering economic study. This paper shows the replacement reasons and preferences related to the different type of life cycle by studying literatures. It is clear by analyzing a basic LCC model that sensitivity of the LCC functions on life cycle gaps is less than the discount rate when life period is longer, so the life cycle seems to be a secondary factor for LCC optimization. But some special replacement projects have been found by an empirical study on some subway engineering assets. The results have demonstrated that the deviation between predicted and actual life greatly affected the LCC of subway engineering, and these gaps mainly contributed the recurring investment to the LCC. A new concept of built environment life cycle is put forward.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.