Abstract

By two-dimensional nonlinear finite element strength reserve coefficient method and the rigid body limit equilibrium method respectively, a comprehensive study of the stability of the 12th sluice section of XiangJiaba hydropower station is made and some conclusions of the instability mode and the lack of safety are reached. The reinforcement measures, which set up concrete cogging at the dam heel and put up additional drainage holes at the stilling basin,are proposed and calculated by the strength reserve coefficient method and the rigid body limit equilibrium method respectively again,Results show that the dam foundation safety meets the code’s standards if the . reinforcement measures are adopted.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.