In order to ensure the safety and stability of the existing old masonry structure houses in the process of dewatering and excavation of the super deep foundation pit of the subway, the support form of a water stop curtain combined with bored cast-in-place piles and internal support is adopted, and the rotary jet grouting piles are constructed around the houses, and sleeve valve pipes are embedded, and the soil and house foundation are grouted and strengthened. The deformation of the building foundation is analyzed by the finite element method. The results show that the deformation of adjacent buildings is mainly uniform at the initial stage of foundation pit dewatering and excavation. With the increase of foundation pit dewatering and excavation depth, the deformation of adjacent buildings shows significant differential characteristics, and the maximum displacement of buildings is settlement deformation. The field monitoring data show that the actual deformation trend and value range of the building structure are basically consistent with the finite element calculation results, and no new damage is found in the building structure during the construction process. Effective foundation pit support method and soil layer reinforcement method can effectively reduce the impact of foundation pit on the deformation of adjacent buildings.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call