Abstract

At present, BIM is increasingly mature in the design and construction stage of engineering projects in China. However, the application of BIM model in FM operation and maintenance stage has not been well popularized and developed. Based on the general situation of Baishan Wanda's reconstruction project and the experience of operation and maintenance management of BIM+FM comprehensive application, this project builds a "BIM+FM" intelligent operation and maintenance management system as the core. Through the CAD drawings of Baishan Wanda Plaza, modeling was carried out by using Revit software, and the model was checked and optimized for collision, which was imported into FM system for operation and maintenance management to achieve standardized, refined management, to improve management efficiency and to reduce the costs of labor and operation management.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.