Abstract

There are two main testing methods for the key parameters of the transformer on-load tap changer. One is the DC test method and the other is the AC test method. Based on the AC test method for on-load tap changer key parameters, a new test scheme was proposed. The on-load tap changer switching operation of the transformer can be simulated by establishing a model. The waveforms of the transitional AC current and the testing AC voltage are stored and preprocessed. Then the transitional AC current is equivalent to DC components through the Park transformation. By using the off-line identification algorithm, the transient stage of the transformer on-load tap changers can be determined and the transition resistance value can be accurately calculated.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call