Abstract

Substation has the advantages of having spare area, close to users, rich communication resources, reliable power supply. By releasing substation site resources, data centers and cloud services can be provided to the society. Construction of Internet Data Center (IDC) with the idle substation resources to realize multi-station integration will economize on social costs and accelerate the development of the digital infrastructure. In this paper, we analysed the participants involved in the expansion data center of the substation. Explore relations among Grid Company, Telecom Operator and User. According to the time sequence of the development of multi-station fusion business, the business time sequence diagram of the substation extended data center station covering the whole business process was designed. Considering the business flow, information flow, and energy flow flows between each section, the dynamic sequence diagram was built. We build the system architecture of business implementation including construction, operation, settlement and other links.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.